银钻国际客服微信-15687937888
Home  >>Building Hoist>>General

Technical parameter of SC200/200


Load capacity2000kg/2000kg
Rated passenger18/18
Lifting speed33m/mincontactor control    fixed speed
0~60m/minVVVF+PLC control    (suggested in high building)
Mast section650x650x1508mm    Thickness 4.5mmPainting      Hot galvanized with extra cost
Cage3.0x1.3x2.2mperforated steel plate and aluminum plastic plate
Anchor (Tie-in)Anchor distance 1.85~2.1m or 2.85~3.2m    One anchor for each 6mas per your request
Transmission systemChinese reputed motors and reducersDesigned under our own technologies
Total power2x3x11Kw (33m/min)    2x3x15Kw (0~60m/min)3 motors/cage
Electrical componentsInverter from YASKAWA, Japan      PLC from Omron, Japan    Others mainly from Schneider
Cable3×25+2X10mm2
Safety systemAnti-drop device SAJ40-1.4;        over voltage/current protection;        electrical & mechanical interlock for cage door; up & down limit switch;      base enclosure;      end buffer.
Free spare parts for each SC200/200Gear: 4PCS      Roller: 8PCS      Brake disc: 2PCS      Button: 2 (Schneider)      Tool box: one set

京ICP备09078545号-48
Copyright © CNBM International Corporation All Rights Reserved. Powered By Sitemap

Online Services
TOM