Technical Sheet of SC120 & SC120/120


Load capacity1200kg/cage
Rated passenger12/cage
Lifting speed38m/mincontactor control
0~60m/minVVVF+PLC
Mast section650x650x1508mm    Thickness 4.5mmHot galvanized
Cage3.0x1.3x2.25m (LxWxH)Steel structure    Aluminum board
Anchor length1.85~2.1m or 2.85~3.2m    From mast center to building surfaceas per your request
Anchor numberEach 6m one anchor
Transmission systemChinese reputed motors and reducersZhangjiang maker, Shanghai
Total powerEach cage 2x11Kw38m/min
Each cage 2x15Kw0~60m/min
Electrical componentsMainly from Schneider
Cable3×16+2X10mm2, special cable for hoist
Safety systemAnti-drop device SAJ30-1.2;        over voltage/current protection;        electrical & mechanical interlock for cage door; up & down limit switch;      base enclosure;      end buffer.
Free spare parts for each SC120/120Gear: 4PCS      Roller: 8PCS      Brake disc: 2PCS      Button: 2 (Schneider)      Tool box: one set


Supply Scope for Building Hoist (SC120/120 50m height)

No.ItemCompositions
1
    Main bodytwo cages (assembled with anti-drop safety device, door limit switches up & down limit switches, 3-phase limit switch, cage control box),        one base frame with 6 J-bolts (M24x410)      two main supply control boxes      one drop testing control box      two cage ladders        two sets of top-cage hand rail      all of the necessary bolts
    2
      Ground enclosureenclosure steel nets and enclosure doors        two sets of mechanical interlocks      all of the necessary bolts
      3
        Mast section34 nos of mast sections  (650x650x1508mm, thickness 4.5mm) with racks assembled, all hot galvanized    mast connection bolts (M24x230)
        4
          Drive systemfour drive units (motor, brake, coupling, reducer)    two drive frames
          5
            Buffertwo buffer seats & six buffer springs
            6
              Cabletwo cables      3x16+2x10m2    60m length
              7
                Mast cranea small crane will be installed on top of cage with capacity of 150kg, used for carrying mast section
                8
                  Anchor7 sets of anchors (for each 6m), all hot galvanized    all of the necessary bolts except the bolts fixed with building structure
                  9
                    Cable guide7 cable guides (for each 6m)    all of the necessary bolts
                    10
                      Cable support armtwo cable support arms      necessary bolts
                      11
                        Cable containertwo cable containers, one for each cage
                        12
                          Limit camsfours sets of limit cams      two sets of 3-phase limit cams    all of the necessary bolts
                          13
                            Tool boxOne set of tool box (16 bolts spanners, one roller adjusting spanner, one set of anti-drop safety device resetting tool, ten rack pins)
                            14
                              Worm wheel oil2x25kg of worm wheel oil
                              15
                                Free partseight rollers, four pinions, two buttons, two brake discs, four door rollers, 10kg print
                                16
                                  Documentsinstallation and maintenance manual    packing list


                                  We supply all of the P/M hoist components except the bolts used to fix anchor into building structure. 